Roles & Responsibilities
Preparation of shop drawings for FF System
Developing the drawings from IFC to a detailed shop drawing
Preparation of schematics and various interface
Preparation of isometric view, standard installation details
Preparation of room coordination drawings and sections related to above systems.
Responsible for the preparation of rack detailed drawing
Responsibilities include preparation of transmittal, copying, batch plotting and distribution of drawings.
Department / Functional Area
Shop Drawing / Drafting / Draughtsman