drjobs
Senior Earned Value Manager
drjobs
Senior Earned Value ....
mace
drjobs Senior Earned Value Manager English

Senior Earned Value Manager

صاحب العمل نشط

1 وظيفة شاغرة
drjobs

حالة تأهب وظيفة

سيتم تحديثك بأحدث تنبيهات الوظائف عبر البريد الإلكتروني
Valid email field required
أرسل الوظائف
drjobs drjobs drjobs
drjobs drjobs
drjobs

حالة تأهب وظيفة

سيتم تحديثك بأحدث تنبيهات الوظائف عبر البريد الإلكتروني

Valid email field required
أرسل الوظائف

الخبرة

drjobs

1 - 2 سنوات

موقع الوظيفة

drjobs

دبي - الامارات

الراتب الشهري

drjobs

لم يكشف

drjobs

لم يتم الكشف عن الراتب

الجنسية

أي جنسية

الجنس

N/A

عدد الوظائف الشاغرة

1 وظيفة شاغرة

الوصف الوظيفي

رقم الوظيفة : 2427751

We are currently looking for a Nuclear System Engineer to support one of our clients on its nuclear projects.


The Nuclear System Engineer will be working within the Systems group of our client, which is part of the Nuclear Processes Competence Centre, in charge of the following consultancy and engineering services activities relating to PWR reactors and fluid systems:
  • Conceptual and Functional design
  • Functional and technical specifications
  • Feasibility and modification studies
  • Functional analyses
  • Performance analysis
  • Operations & Maintenance support
  • Input to commercial bidding for engineering services.

The main tasks and duties of the Nuclear System Engineer will be:

  • Perform systems functional analyses and calculations, define test programs.
  • Take part to completion of test programs on the field.
  • Participate in the design of systems within the Nuclear Island of PWRs, using the necessary tools and methods.
  • Deliverables will consist of technical notes, test procedures, reports, equipment functional specifications and other documents to be prepared and issued according to nuclear regulatory and quality standards.
  • In contact with clients to listen to and understand their needs, to prepare scope of works and to present results of your analyses.


Requirements

  • Civil or industrial engineer with a strong will to develop the personal technical expertise.
  • Knowledge of thermo-hydraulics and heat transfer phenomena.
  • Experience in the Nuclear sector (PWR design) is an advantage plus.
  • Prior experience with IT tools such as Flowmaster for calculation of fluid dynamics is an advantage.
  • Strong analytical mind and a problem solving attitude.
  • Committed to meeting the deadlines and you care for quality and safety.
  • Rigorous in the work and have a questioning attitude.
  • Fluent in French or Dutch
  • Fluent in English
  • Able to write technical documents and synthesis reports.
  • Available and open to gain new competences as well as to share them.


Nuclear, Process

نوع التوظيف

دوام كامل

المجال

لم يذكر

القسم / المجال المهني

الإدارة العليا / الإدارة العليا

نبذة عن الشركة

الإبلاغ عن هذه الوظيفة
إخلاء المسؤولية: د.جوب هو مجرد منصة تربط بين الباحثين عن عمل وأصحاب العمل. ننصح المتقدمين بإجراء بحث مستقل خاص بهم في أوراق اعتماد صاحب العمل المحتمل. نحن نحرص على ألا يتم طلب أي مدفوعات مالية من قبل عملائنا، وبالتالي فإننا ننصح بعدم مشاركة أي معلومات شخصية أو متعلقة بالحسابات المصرفية مع أي طرف ثالث. إذا كنت تشك في وقوع أي احتيال أو سوء تصرف، فيرجى التواصل معنا من خلال تعبئة النموذج الموجود على الصفحة اتصل بنا