أدخل المسمى الوظيفي أو الكلمة الرئيسية

Data Center Construction Director(MEP)

NAFFCO


موقع الوظيفة:

دبي - الإمارات

الراتب: لم يتم تقديمه من قبل صاحب العمل
تم النشر: 19 نوفمبر 2026 (نُشرت قبل 4 يوم)
آخر موعد للتقديم: 16 فبراير 2027
عدد الوظائف الشاغرة: 1 عدد الوظائف الشاغرة

ملخص الوظيفة


Data Center Construction Director(MEP)

Location: UAE / GCC

We are seeking an accomplished Data Center Construction Director to lead the end-to-end construction and delivery of large-scale data center and critical infrastructure projects across the GCC.

The successful candidate will bring extensive experience in construction management critical MEP infrastructure modular data center deployment and commissioning with a proven track record of delivering fully operational data center facilities.

Key Responsibilities
  • Lead greenfield and brownfield data center construction projects from mobilisation through completion and handover.

  • Oversee civil structural architectural and MEP construction activities.

  • Manage critical electrical and mechanical infrastructure including UPS generators transformers switchgear chillers and cooling systems.

  • Ensure effective integration of BMS EPMS EMS ELV and fire protection systems.

  • Lead modular and prefabricated data center construction including factory-integrated MEP modules and containerised facilities.

  • Manage EPC contractors subcontractors consultants suppliers and multidisciplinary project teams.

  • Drive project planning budgets cost control quality HSE and construction schedules.

  • Lead FAT SAT Integrated Systems Testing (IST) commissioning and final operational handover.

  • Ensure redundancy resilience and failover configurations meet project requirements.

Key Requirements
  • Bachelors degree in Civil Mechanical or Electrical Engineering; Electrical or Mechanical preferred.

  • 1520 years of overall construction industry experience.

  • Minimum 810 years of direct data center construction experience.

  • Proven track record of personally delivering complete operational data center projects.

  • Strong expertise in critical MEP infrastructure and mission-critical building services.

  • Practical exposure to modular and prefabricated data center construction.

  • Experience working with main contractors or EPC contractors.

  • Strong project leadership commercial management planning and execution capabilities.

  • GCC project experience is highly desirable.

Important: This is a hands-on construction leadership position. Candidates with purely IT infrastructure data center operations or design-only backgrounds will not be considered.

Candidates should have demonstrable experience in physically delivering data center construction projects ideally combining conventional data center construction with exposure to modular deployments.



عن الشركة

NAFFCO

1000 موظف

Company Logo

Headquartered in Dubai, NAFFCO FZCO is among the world’s leading producers and suppliers of top-tier firefighting equipment, fire protection systems, fire alarms, security and safety engineering systems. Aligned with our vision to become world’s no.1 provider of innovative ... اعرض المزيد

عرض صفحة الشركة عرض صفحة الشركة