MECHANICAL, ELECTRICAL AND PLUMBING
- Preparation of Lighting & power drawings Approvals
- Coordination with the Client/Consultant/design engineers for the approval of drawings
- MEP Shop Drawing Layout Preparation
- MEP As Built Layout Preparation
- Preparation of builder s work drawing for low current system
- Preparing standard details & sections drawings
- Shop drawing coordinating with other services
- Coordination with the Client/Consultant/design engineers for the approval of drawings
- Hand Over Documents Preparation
EXTRA LOW VOLTAGE (ELV)
- Preparation of ELV co-coordination drawings
- Systems drawings & Schematic Diagram
- SCN
- PAS
- CCTV
- IPTV
- FIDS
- MCS
- SACS
- RADIO
- VIDEO WALL
- WDN
- Preparing standard details & sections drawings
- Shop drawing coordinating with other services
- Coordination with the Client/Consultant/design engineers for the approval of drawings
- Hand Over Documents Preparation
- Prepare fire & life safety , Fire protection documentation for submission
- The fire & life safety documentation shall include, not limited to
- Fire and Smoke walls / doors;
- Fire Ratings of main building elements;
- Egress distances;
- Remoteness of Exits;
- Preparing standard details & sections drawings
- Shop drawing coordinating with other services
- Coordination with the Client/Consultant/design engineers for the approval of drawings
- Hand Over Documents Preparation
FIRE PROTECTION
- Fire and Smoke walls / doors;
- Fire Ratings of main building elements;
- Egress distances;
- Remoteness of Exits;
- Gas detection system
- Smoke Ventilation system
- Firefighting
- Fire alarm (including smoke detectors and heat detectors)
- Emergency lighting